
Sanyelian Shunt
After the GKD1A took over the passengers, steam locos took over most of the trip freights on the Baiyin system. SY.1047 shunted the upper yard at the Sanyelian smelter on 7 March 2014.
PHOTO DATA FOR IMAGE 14-D-1478
camera : Nikon D700
lens : 28-70mm f/2.8
focal length : 65.0 (65mm 35mm eq)
shutter : 1/640 sec
aperture : f/11.0
ISO : 400 ISO
original : Digital: 12MP NEF
SUBJECT DATA
Loco / Unit : SY.1047
Train : Shunting
Location : Sanyelian
Line : Baiyin Mineral Railway
Country : China
Date & Time : 07/03/2014 16:30