Beijing Bureau : DaQin Coal Line
  ( 6 images )

images sorted by date taken
latest first    
    (change)
This busy electrified freight line was built in the late 1980s to move coal from the Datong coalfield to Qinhuangdao port. In order to avoid the Beijing city area, it runs through the mountains to the north, using a succession of bridges and tunnels to conquer the difficult terrain. Trains are heavy and frequent.
page : 1009
WK000 : 2024-10-22
CS000 : 2022-08-03
CK000 : 2024-08-04
GS000 : 2022-08-05
GK000 : 2022-08-13








diagnostics

window : 0
viewport : 0
image frame : 0
outer frame size : 0
data block size : 0
caption block : 0
sideblock1 : 0
sideblock2 : 0
spacer 2 width : 0
spacer 3 width : 0