The first four Ge4/4i Bo-Bos were built for the RhB's 11kV network in 1947 with six more following in 1953. They were extensively rebuilt in the late 1980s but retained tapchanger control. The class was scheduled for withdrawal in 2012 but four locos have been retained for specials and other ad-hoc workings.