Despite appearances, the hillside at Salling was wedged with photographers when 232.240 eased across the bridge with 101.020 and diverted EC115 in tow on the afternoon of 26 October 2013.
A year later the location looked quite different with a new bridge being built to the left of the existing bridge in preparation for the double tracking and electrification of the line.