
Reassembly
It took around two hours for the coal to be unloaded, then the process of reassembling the train commenced. JS 6546 collected the empties from one of the unloading sheds on 6 November 2011. There was a similar two-track structure at the far end of the site.
PHOTO DATA FOR IMAGE 11-D-2757
camera : Nikon D2X
lens : 28-70mm f/2.8
focal length : 45.00 (67.5mm 35mm eq)
shutter : 1/640 sec
aperture : f/9
ISO : 250 ISO
original : Digital: 12MP NEF
SUBJECT DATA
Loco / Unit : JS.6546
Train : Shunting
Location : Fula'erji Erdian
Line : Fula'erji Erdian (No.2 Power Station)
Country : China
Date & Time : 06/11/2011 14:31