![main photo](i/11-D-3643.jpg)
Ash Train
SY 0988 rejoined the colliery main line with a train load of ash from one of the two coal-fired power stations at Chengnan on 13 November 2011. There appeared to be a regular flow of ash from power stations in the Fuxin area to the tip at Wulong.
PHOTO DATA FOR IMAGE 11-D-3643
camera : Nikon D2X
lens : 28-70mm f/2.8
focal length : 38.00 (57mm 35mm eq)
shutter : 1/500 sec
aperture : f/8
ISO : 200 ISO
original : Digital: 12MP NEF
SUBJECT DATA
Loco / Unit : SY.0988
Train : Spoil Loads
Location : Chengnan Power Station
Line : Fuxin Mining Railway
Country : China
Date & Time : 13/11/2011 14:13