image 139 of 246

High Speed Trains
149 Waterloo - Reading and branches
17-D-3038
Testing Times for Hitachi
The prototype IEP ventured into 3rd rail territory on 16 and 17 May 2017 spending two nights on test between Reading and Ascot. 800.001 passed Wokingham at 00:36 on the 17th, working 5X30, the 23:12 from North Pole I.E.P. Depot to Ascot .camera : Nikon D600
lens : 28-70mm f/2.8
focal length : 48 mm
shutter : 1/320sec
aperture : f/3.5
ISO : 3200
original : Digital 24 MP NEF