image 165 of 246

High Speed Trains
125 Didcot - Swindon
16-D-4683
Parkway Terminator
43.174 and 43.147 passed through the cutting at Baulking with 1U40, the 13:45 from Paddington to Bristol Parkway, on 14 September 2019. This would normally have been a Swansea train but terminated at Parkway for the duration of the six week Severn Tunnel closure for electrification work.camera : Nikon D610
lens : 70-200mm f/2.8
focal length : 85 mm
shutter : 1/1000sec
aperture : f/9.0
ISO : 400
original : Digital 24 MP NEF