image 6 of 8
photo 05-D-0419
Meihekou Mining Railway
05-D-0419

Getting Underway

The output from all the pits along the line was marshalled into long trains at Yijing before being taken to the national railways at Heishantou. SY 0791 was photographed getting underway from Yijing with one such train on the bright but misty morning of 2 March 2005.
camera : Fuji S2Pro
 
lens : 24-85mm f/2.8-4.0
 
focal length : 79 mm (118.5 mm eq.)
 
shutter : 1/500sec
 
aperture : f/9.5
 
ISO : 200
 
original : Digital 12MP JPEG
slide bar :
Xmore images on the theme : China : Meihekou Mining Railway       (click thumbnail to view)
05-D-0462
 
05-D-0459
 
05-D-0455
 
05-D-0490
 
05-D-0481
 
no preceding images
 
05-D-0422
 
05-D-0389
 
no preceding images
 
php v : 1003     |     txt v : T000     |     pub : 2016/07/13