![main photo](i/88-D2-10.jpg)
Under Repair
QJ 6355 in the workshops at Baotou Xi Depot on 12 April 1988. The front cowling has been partially removed to reveal the casing of the feedwater heater on top of the smokebox. The chimney petticoat is visible inside the smokebox and the cylinder covers and pistons have been removed. Note the cylinder covers on either side, each carried on a trolley specifically designed to aid removal and refitting.
PHOTO DATA FOR IMAGE 88-D2-10
camera : Mamiya 645 1000s
lens : 80mm f/2.8
focal length : 80 (53.3mm 35mm eq)
shutter : 1/30 sec
aperture : f/4.8
ISO : 200 ISO
original : 645 TMY TMax 400
SUBJECT DATA
Loco / Unit : QJ.6355
Train : under repair
Location : Baotou Xi Depot
Line : Baotou Area
Country : China
Date & Time : 12/04/1988 09:26