![main photo](i/14-D-5518.jpg)
Hanging On
By November 2014, the spoil operation based at Xibolizhan had been finished for several months. However, the workers train was still running from Dongbolizhan every morning but via the opencast pit as the direct line had been severed.JS.8190 prepared to leave Dongbolizhan on the morning of 26 November 2014.
PHOTO DATA FOR IMAGE 14-D-5518
camera : Nikon D600
lens : 28-70mm f/2.8
focal length : 45.0 (45mm 35mm eq)
shutter : 1/80 sec
aperture : f/5.6
ISO : 1600 ISO
original : Digital: 24MP NEF
SUBJECT DATA
Loco / Unit : JS.8190
Train : 08:40 Donbolizhan - Xibolizhan passenger
Location : Dongbolizhan
Line : Sandaoling Mining Railway
Country : China
Date & Time : 26/11/2014 08:28