![main photo](i/09-D-0791.jpg)
Temporary Track
At the bottom of the pit the railway was laid directly on the coal seam and giant electric shovels excavated the coal from beside the track. It would soon be time to move the rails to the right and dig out the coal beneath where the train stood.SY.1193 waited for its train to be loaded on 4 March 2009.
PHOTO DATA FOR IMAGE 09-D-0791
camera : Nikon D2X
lens : 28-70mm f/2.8
focal length : 56.00 (84mm 35mm eq)
shutter : 1/500 sec
aperture : f/9
ISO : 200 ISO
original : Digital: 12MP NEF
SUBJECT DATA
Loco / Unit : SY.1193
Train : Coal
Location : Opencast Mine
Line : Zhalainuoer Mining Railway
Country : China
Date & Time : 04/03/2009 09:51